CharboneTSXV: CHSecured convertible loan of up to C$10m
2026
2026
This drawdown reflects the continued confidence RiverFort has placed in CHARBONE and our execution to date. The structured, multi-tranche nature of this facility allows us to access growth capital in a disciplined way, aligned with our operational milestones at Sorel-Tracy and across our industrial gases platform.
On the second drawdown · 2 September 2026